Fall 2015

Click here for a PDF of the HAB Payload: Payload Drawing

Task Members Notes
Payload Integration (include Garmin tracker(s)). (responsible for integrating all items “hanging from the balloon,” i.e., any item, including clips and strings, not physically touching the latex of the balloon.)  Rope on tethered test day.   Zach BlaszczykDrew Harkness

Matt Snyder

Josh Guy

Tying, knotting, taping up pods, clipping stringed pods together, pod construction/modificationWeigh stack from parachute on down; complete as much as possible day before launch, configure and track Garmin trackers (including practice)
Launch Processing (responsible for anything that touches the latex of the balloon + lift measurement)  Clint BargerMatt Snyder

 

Tarp layout, balloon filling, lift measurement, balloon tie-off,Inserting floater valve
Cameras, Two Contours + Sony  Paul ElpersDrew Harkness Proper operation of cameras (online), batteries charged, cleared memory, Camera functions/options fully learned
Website   Zach BlaszczykJosh Guy www.usinearspace.com
Flight Trajectory PredictionWed, Thurs, Friday before flight and ;

Practice during two months prior

  Drew HarknessJordan Sudduth

 

 

Use ASTRA (CUSF & Iowa State? as backups), Jerry Gable site may work for floater predict, weather, both practice each week
Launch Site Selection calling and confirming launch sites, Wed, Thurs. Fri before launchChoose launch site: flt day a.m.   Drew HarknessJordan Sudduth

 

Maximize chance of landing in prime landing area. All contact info for launch sites, practice each week, maps, contact FAA
Temperature Measurement     Paul ElpersMatt Snyder

Jordan Sudduth

Outside and inside balloon wake measured with highest possible accuracy.  Results graphed
Command Pod, TU-401 (= aprs = automatic packet reporting system) pod, Launch van antenna & laptops, Suburban antenna & laptop (including power management of all connected devices in van/Suburban)     Paul ElpersJosh Guy

 

 

 

All components need to be in hand by September 10; shown to work simultaneously by September 17; (recommendations can be made for laptop replacements),  wifi hotspots (second vehicle?)
Recovery Options  Drew HarknessClint Barger Be prepared for water, tree or thicket landings and lack of cell phone coverage; maps
Live launch feed   Zach BlaszczykJosh Guy For tethered test, launch, flight, recovery
Floater valve John Siepierski For HAB-18
CubeSat prototype (solar cells) Zach Blaszczyk Develop a CubeSat prototype with solar cells, accelerometer, gyros, etc

Launch Countdown

days
0
-14
-3
hours
0
-8

minutes
-4
-6
seconds
-3
-6